Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Jul 02, 2008     Systems installation - (1.9 hours)       Category: Fuselage
Today I began re-installing all the various subsystems I'd removed in order to paint the interior. I installed the power outlet in the rear cockpit, the fuel vent fittings inside the gear pockets, the fuel filter, and the overboard pressure-relief port for the smoke system.

Photo 1: There will be a 3/4" hole on the left for the brake lines.
Photo 2: The fuel filter. I attached it with AN-3 bolts. There are nutplates inside the gear tower.
Photo 3: Smoke system belly port, fastened with rivets and sealed with Proseal.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.